OEE Calculator
A free tool by DeepRit, a Google Ads agency that does PPC and nothing else. We build and run Google Ads accounts so every click is accounted for. Book a free audit call
Free OEE calculator. Work out overall equipment effectiveness from planned time, downtime, ideal cycle time and counts, with each loss shown.
- Availability
- 0
- Performance
- 0
- Quality
- 0
- Run time
- 0
Free, no sign-up. Runs in your browser: nothing you type is uploaded or saved.
How to use the OEE calculator
- Enter the planned production time in minutes: the time the equipment was scheduled to run, excluding planned breaks and planned maintenance.
- Enter the downtime in minutes: unplanned stops and planned stops such as changeovers that happened during the planned time.
- Enter the ideal cycle time in seconds per piece: the fastest the equipment can make one good part under ideal conditions.
- Enter the total count of pieces produced, including rejects.
- Enter the good count: pieces that passed first time, with no rework.
The OEE calculator shows the overall equipment effectiveness and its three factors, availability, performance and quality, together with the run time.
What is OEE?
Overall equipment effectiveness (OEE) is the standard measure of how productive a manufacturing process really is. It compares what the equipment actually produced with what it could have produced if it had run all the planned time, at full speed, making only good parts. An OEE of 100% means perfect production: no stops, no slow running and no defects.
OEE grew out of total productive maintenance (TPM), an approach developed in Japan and popularised by Seiichi Nakajima from the 1970s onwards. It's now used throughout manufacturing because a single figure shows how much of the available capacity is being lost, and the three factors show where.
The OEE formula
OEE = availability × performance × quality
- Availability = run time ÷ planned production time. Run time is planned time minus downtime. It captures stops.
- Performance = (ideal cycle time × total count) ÷ run time. It captures running slower than ideal, including small stops that aren't recorded as downtime.
- Quality = good count ÷ total count. It captures defects and rework.
With the default figures, 480 minutes planned, 47 minutes of downtime, a 1-second ideal cycle time, 19,271 pieces in total and 18,848 good:
- Run time: 480 − 47 = 433 minutes.
- Availability: 433 ÷ 480 ≈ 90.2%.
- Performance: (1 × 19,271) ÷ (433 × 60) ≈ 74.2%.
- Quality: 18,848 ÷ 19,271 ≈ 97.8%.
- OEE: 0.902 × 0.742 × 0.978 ≈ 65.4%.
The OEE calculator converts the run time to seconds so that it matches the cycle time.
What is a good OEE score?
An OEE of 85% is widely quoted as world class for discrete manufacturing. That benchmark is often broken down as roughly 90% availability, 95% performance and 99.9% quality. In practice, many plants run well below this. Scores of around 60% are commonly described as typical, and around 40% as low but not unusual for operations that are just starting to measure. The most useful comparison is usually with your own past performance on the same equipment, because products, processes and how each factor is measured vary between plants.
A worked example
A packaging line is planned to run for 450 minutes in a shift. It's stopped for 30 minutes. Its ideal cycle time is 2 seconds per pack. It produces 11,000 packs, of which 10,450 are good.
- Run time: 450 − 30 = 420 minutes, or 25,200 seconds.
- Availability: 420 ÷ 450 ≈ 93.3%.
- Performance: (2 × 11,000) ÷ 25,200 ≈ 87.3%.
- Quality: 10,450 ÷ 11,000 = 95.0%.
- OEE: 0.933 × 0.873 × 0.95 ≈ 77.4%.
Quality is the weakest factor here, so reducing rejects would be a good place to start. Enter these figures in the OEE calculator to check.
The six big losses
TPM groups the causes of lost productivity into six big losses, two for each OEE factor:
- Availability losses: equipment failures (unplanned stops) and setup and adjustments (changeovers, material shortages, waiting for operators).
- Performance losses: idling and minor stops (short jams, blocked sensors) and reduced speed (running below the ideal rate because of wear, poor materials or cautious settings).
- Quality losses: process defects (scrap and rework during steady running) and reduced yield (defects during start-up after a changeover or warm-up).
Tracking downtime and rejects by cause helps you find which losses matter most, so you can focus improvement work where it will raise OEE the most.
Choosing the ideal cycle time
The ideal cycle time is the most important and most often misunderstood input. It should be the theoretical fastest time to make one piece, usually from the equipment's design speed or nameplate capacity, not an average or a target. If you use a slower figure, performance looks better than it really is and can even exceed 100%, which is a sign the cycle time is set too slow. The OEE calculator warns you when that happens. For equipment that makes several products at different speeds, use the ideal cycle time for the product being run, or calculate OEE separately for each product.
Who uses an OEE calculator
Production managers use it to track line performance shift by shift. Maintenance and reliability engineers use it to measure the effect of maintenance programmes. Continuous improvement and lean teams use it to choose and measure improvement projects. Plant managers and operations directors use it to compare lines and justify investment.
Bring in the next customer from Google
Numbers like these keep a business running. Google Ads, run carefully, is how many small businesses bring in the next customer. DeepRit is a Google Ads agency that does PPC and nothing else: we build the campaigns, block the searches that waste money, write the ads, set up conversion tracking and send you a short report every week. Request a free PPC audit and we will show you, in dollars, what we would fix first.
OEE, TEEP and capacity
OEE measures effectiveness during planned production time. It doesn't count time when the equipment isn't scheduled, such as nights or weekends with no shifts. A related measure, total effective equipment performance (TEEP), uses all the time in the calendar instead:
TEEP = OEE × utilisation, where utilisation = planned production time ÷ all available time.
A line with an OEE of 80% that runs one 8-hour shift a day, seven days a week, has a utilisation of 33.3% and a TEEP of about 26.7%. TEEP shows how much hidden capacity could be unlocked by adding shifts, while OEE shows how well the scheduled time is used.
Why multiplying the factors matters
Because OEE multiplies the three factors, small losses in each add up. Three factors of 90% each give an OEE of only about 72.9%. This is why OEE is often surprisingly low when first measured, even on lines that seem to run well. It also shows that improving the weakest factor usually raises OEE most.
Measuring OEE in practice
Accurate OEE needs accurate data. Many plants start by recording downtime, counts and rejects by hand on a shift sheet, then move to automatic data collection from machine controllers. Whichever you use, define each term clearly and consistently: what counts as planned time, which stops are downtime and which are small stops, and what counts as a good part. Changing definitions makes trends meaningless. Review OEE regularly with the people who run the equipment, because they usually know the causes of the losses best.
OEE in process industries
OEE was developed for discrete manufacturing, where you count individual pieces. In process industries, such as chemicals, food or paper, output is often measured by weight or volume. The same formula works if you use a consistent unit: the ideal rate becomes the maximum output per minute, and counts become quantities. The OEE calculator expects a cycle time in seconds per unit, so convert your ideal rate into seconds per unit first.
Common mistakes
- Using an average cycle time instead of the ideal one, which inflates performance.
- Excluding changeovers from downtime, which hides a major availability loss.
- Counting reworked parts as good, which inflates quality.
- Comparing OEE between plants with different definitions.
Improving OEE step by step
A practical approach is to start with the factor that shows the largest loss and work on its biggest cause. Availability losses often respond to better preventive maintenance and faster changeovers; the single-minute exchange of die (SMED) method is a well-known way to cut changeover time. Performance losses often come from small, frequent stops that nobody records, so watching the line for an hour can reveal them. Quality losses respond to root cause analysis of defects and to stable settings after start-up. After each change, run the OEE calculator again with fresh data to confirm the improvement held.
Sources and further reading
- Overall equipment effectiveness on Wikipedia: the formula, benchmarks and history.
- Total productive maintenance on Wikipedia: the approach OEE comes from, including the six big losses.
- Lean Enterprise Institute: Overall equipment effectiveness, a definition from the lean lexicon.
Frequently asked questions
How is OEE calculated?
OEE = availability × performance × quality, where each factor compares actual output with ideal output for stops, speed and defects.
What is a good OEE?
85% is often quoted as world class for discrete manufacturing; around 60% is commonly described as typical.
Why is my performance over 100%?
The ideal cycle time is probably set too slow. Use the equipment's fastest theoretical cycle time.
Should changeovers count as downtime?
Yes, in standard OEE they're an availability loss, because they happen during planned production time.
What is the difference between OEE and TEEP?
OEE uses planned production time; TEEP uses all calendar time, so it also reflects how much the equipment is scheduled.
Is the OEE calculator free?
Yes. It's free, needs no sign-up, and works in your browser.